Construction Updates 1/26/2024

1/26/2024: Work accomplished this week…
North Wing

  • Continued MEP rough-ins throughout.
  • Continued hanging and finishing drywall within units andalong corridors on all floors.
  • Continued framing and hanging drywall soffits along second floor corridor.
  • Continued priming and painting walls/ceilings within units on first and second floor.
  • Completed pouring third floor gypcrete.
  • Began MEP finishes within first floor units.
  • Completed installation of countertops in units 101 thru 104.
  • Continued installation of resident unit casework.
  • Continued installation of pre-hung doors and door trim in second floor units
  • Continued installation of exterior façade.

South Wing

  • Continued MEP rough-ins throughout.
  • Completed installation of gas piping.
  • Continued excavation for new connector foundation to Commons building.

Commons

  • Continued finishing drywall within formal dining room.
  • Continued hanging wood slat ceilings within formal dining area.
  • Completed MEP rough-ins at bar area.
  • Began installation of MEP finishes.
  • Began installation of interior storefront windows.
  • Completed removal of exterior brick façade.
  • Completed saw cutting and block work at new opening on lower level for IL apartment connector.