Construction Updates 3/8/2024

3/8/2024: Work accomplished this week…
North Wing

  • Continued MEP rough-ins on upper floors.
  • Began hanging and finishing drywall within first floor common space and along first floor corridor ceilings.
  • Continued priming and painting walls/ceilings within units on upper floors.
  • Continued MEP finishes within second and third floor units.
  • Continued installation of resident unit casework, pre-hung doors, and trim within third and fourth floor units.
  • Set countertops on second and third floor unit casework.
  • Continued installation of exterior façade.
  • Continued laying flooring within second and third floor units.
  • Continued installation of balcony railings.
  • Began installation of metal roof at east side entry pavilion.
  • Began setting apartment entrance metal frames and doors on upper floors.

South Wing

  • Continued hanging and finishing drywall on upper floors.
  • Continued MEP rough-ins throughout.
  • Formed and placed new connector slab on grade.
  • Continued installation of balcony railings.
  • Poured gypcrete on third floor.

Commons

  • Continued installation of MEP finishes.
  • Continued installation of food service equipment and casework.
  • Completed installation of MUA-2 ductwork.
  • Continued installation of exhaust fan ducting to expo kitchen hood.
  • Completed hanging cement board at fireplace.
  • Completed framing opening within formal dining area into new IL apartment connector.
  • Began setting roof trusses for new IL apartment connector.
  • Set doors and frames within kitchen area.