3/22/2024: Work accomplished this week…
North Wing

  • Continued MEP rough-ins on upper floors.
  • Continued finishing drywall within first floor common space and along first floor corridor ceilings.
  • Continued priming and painting walls/ceilings within units on upper floors.
  • Continued MEP finishes within second and third floor units.
  • Continued installation of resident unit casework, countertops, pre-hung doors, and trim within third and fourth floor units.
  • Continued laying flooring on upper floors.
  • Continued installation of balcony railings.
  • Continued installation of metal roof at east side entry pavilion.

South Wing

  • Continued hanging and finishing drywall throughout.
  • Continued MEP rough-ins throughout.
  • Continued installation of balcony railings.
  • Completed setting structural steel and began framing/sheathing new Common’s Building connector.
  • Continued installation of switchgear and pulling wire to sub panels.
  • Began installation of pre-hung doors and trim within third and fourth floor units.
  • Poured gypcrete on second floor.

Commons

  • Continued installation of MEP finishes.
  • Continued installation of food service equipment and casework.
  • Completed setting roof trusses and began installing roofing system for new IL apartment connector.
  • Completed hanging drywall ceiling in Fullenbach Room and at Captain’s table.
  • Began priming and painting ceilings within Fullenbach room and at Captain’s table.
  • Began framing walls and soffits in IL apartment connector.
  • Continued installation of bar area ceramic tile.
  • Installed ACT grid in expo kitchen.
  • Completed installation of dishwasher exhaust fan.
  • Began priming and painting metal doors and frames.