Construction Updates 4/19/2024

Work accomplished this week…
North Wing

  • Completed MEP rough-ins on upper floors.
  • Continued priming and painting walls/ceilings within units and corridors.
  • Continued MEP finishes within third and fourth floor units.
  • Began installation of MEP finishes in corridors.
  • Continued installation of resident unit casework and countertops within fourth floor units.
  • Continued laying flooring on fourth floor.
  • Continued installation of west side elevator.
  • Began installation of ceiling grid on third and fourth floor corridors.
  • Continued installation of corridor pilaster panels and chair rail.
  • Began grading west side parking lot area.

South Wing

  • Continued hanging and finishing drywall throughout.
  • Continued priming and painting walls/ceilings within units and corridors.
  • Continued MEP rough-ins throughout.
  • Continued installation of pre-hung doors trim, casework, and countertops within units.
  • Framed soffits and poured gypcrete floor at new connector.

Commons

  • Completed finishing drywall soffits and walls in the upper-level link corridor to the new IL apartment.
  • Completed installation of LVP flooring and painting of walls and ceilings in the upper-level link corridor to the new IL apartment.
  • Continued architectural and SCOPOS punchlist for formal dining and bar area.
  • Completed hanging drywall and ceiling grid/tile within lower-level link corridor to new IL apartment.
  • Completed installation of furniture within upper-level areas.